Q-2, r. 18 - Regulation respecting the burial of contaminated soils

Full text
39. Holes, fissures and subsidence must be repaired until the soil deposits are completely stabilized so as to prevent water from accumulating on the different cover layers or from infiltrating into the site.
O.C. 843-2001, s. 39.